Ford Mustang (1999-2004) Service Manual: Cylinder Head Temperature (CHT) Sensor - 3.8L

Removal

1. Disconnect the battery ground cable. For additional information refer to Section.

2. Disconnect the cylinder head temperature sensor connector.

Cylinder Head Temperature (CHT) Sensor - 3.8L

3. Remove the CHT sensor.

Cylinder Head Temperature (CHT) Sensor - 3.8L

Installation

1. To install, reverse the removal procedure.

    Idle Air Control (IAC) Valve - Mach I
    Removal and Installation 1. Remove the air intake scoop. For additional information, refer to Section. 2. Disconnect the idle air control (IAC) valve electrical connector. 3. Remove the bolt ...

    Engine Coolant Temperature (ECT) Sensor - 4.6L (2V)
    Removal 1. Disconnect the battery ground cable. For additional information, refer to Section. 2. Partially drain the cooling system. For additional information, refer to Section. 3. Disc ...

    Other materials:

    Installation
    CAUTION: Electronic modules are sensitive to static electrical charges. If exposed to these charges, damage may result. 1. NOTE: Two technicians are necessary to carry out this step. Install the instrument panel. 2. Install the upper instrument pa ...

    Ignition Coil-On-Plug
    Material Item Specification Silicone Brake Caliper Grease and Dielectric Compound D7AZ-19A331-A or equivalent ESE-M1C171- A Removal and Installation 1. Disconnect the battery ground cable. For additional information, refer to Section ...

    Component Tests
    Driveline Vibration An analysis of driveline vibration can also be conducted using the Vibration Analyzer; follow the manufacturer's directions. Driveline vibration exhibits a higher frequency and lower amplitude than does high-speed shake. Driveline vibra ...