Ford Mustang (1999-2004) Service Manual: Cylinder Head Temperature (CHT) Sensor - 3.8L

Removal

1. Disconnect the battery ground cable. For additional information refer to Section.

2. Disconnect the cylinder head temperature sensor connector.

Cylinder Head Temperature (CHT) Sensor - 3.8L

3. Remove the CHT sensor.

Cylinder Head Temperature (CHT) Sensor - 3.8L

Installation

1. To install, reverse the removal procedure.

    Idle Air Control (IAC) Valve - Mach I
    Removal and Installation 1. Remove the air intake scoop. For additional information, refer to Section. 2. Disconnect the idle air control (IAC) valve electrical connector. 3. Remove the bolt ...

    Engine Coolant Temperature (ECT) Sensor - 4.6L (2V)
    Removal 1. Disconnect the battery ground cable. For additional information, refer to Section. 2. Partially drain the cooling system. For additional information, refer to Section. 3. Disc ...

    Other materials:

    Transmission Fluid Cooler Tubes
    Removal 1. Disconnect the battery cables. 2. Raise and support the vehicle. For additional information, refer to Section. 3. Remove the nuts. 4. Remove the fluid cooler tube bracket at the engine. 5. NOTE: Use a backup wrench to hold the case fitting sec ...

    Fuel Pump Module
    Removal and Installation 1. Remove the fuel tank. For additional information, refer to Fuel Tank in this section. 2. NOTE: For installation, tighten the bolts in the sequence shown. Remove the module assembly flange bolts. 3. Clean the area around the fue ...

    Principles of Operation
    Power Window Control NOTE: Battery power and ground must be removed before disconnecting the GEM connectors to avoid setting false DTCs. The driver power window one-touch down operation is controlled by the generic electronic module (GEM). This featur ...