Ford Mustang (1999-2004) Service Manual: Lower Intake Manifold
Material

Installation
1. Install a new upper intake manifold gasket.
2. NOTE: Refer to the location note made during removal and make sure
the bolts are installed in
the correct locations.
Install the upper intake mani ...
Removal
1. Remove the upper intake manifold. For additional information, refer to
Upper Intake Manifold in
this section.
2. Partially drain the cooling system. For additional information, refer to
Sect ...
Other materials:
Piston - Selection
NOTE: The cylinder bore must be within the specifications for
taper and out-of-round before fitting a
piston.
1. Select a piston size based on the cylinder bore.
2. NOTE: For precision fit, new pistons are divided into three
categories within each size ...
Rear Drive Axle/Differential - Ford 7.5-Inch Ring Gear
General Specifications
a: In-vehicle repair refill capacities are determined by filling the rear axle
with the specified lubricant to
6.4-14.3-mm (1/4-9/16-in) below the bottom of the fill hole.
Torque Specifications
...
Installation
1. Install the bearing.
1. Position the knuckle on the press.
2. Using the appropriate step plate adapter, press the bearing into the
knuckle until the
bearing clears the snap ring groove and bottoms out in the bore.
2. Install the snap ring.
3. CA ...
